Part O Requirements

What do I need to provide for Part O assessment and which method should I choose?

Which method should I choose?


If you don't know the differences between Simplified Method and Dynamic Thermal Modelling, we advise you to download the .pdf document from link below. It will allow you to better understand both methods and choose the more appropriate one.

Download .pdf

What information do I have to provide for Part O assessment?


 1.  Floor Plans

 

Floor plans that are true to scale, with dimensions and showing all the internal partitions.


We also require a site plan to establish the orientation of the dwelling.

 

Make sure the windows on the plans match with the elevations and sections.

 

E.g.  The illustration below shows windows that do not match each other on floor plans and elevations.

 Floor plan has window with one glazed panel; the façade shows it has two glazed panels. Therefore, it will be hard for us to establish which one is correct.


This illustration below shows windows that match both floor plans and elevations. We know this window has two glazed panels.



2.  Elevations

 

We need you to provide the elevations with windows that have frame and opening (top / bottom / left / right / central etc.) marked on the plans. It will allow us to calculate the equivalent areas of openings.



3.  Sections


Make sure the section will show the window (including inner windowsill length, outer windowsill length and height to sill). It enables us to assess the window opening against protection from falling.



Please provide more sections if windows have different specifications (e.g., window A height to sill is 1.1 m, while window B height to sill is 0.8 m).



4.  Window openings & window sizes

 

Please check your elevations drawing before sending the file to us. We need the window to be drawn with glazing area, opening heights and widths clearly shown on the drawings.



A separate document with window schedule and details (frame sizes etc.) can be supplied to support the information.

 

Note: The more detailed the information the more likely we are to be able to confirm compliance and provide solutions if not compliant. Hand drawings can be difficult for us to finish the assessment.



5. Other considerations

 

Have noise and pollution been assessed? Are there any reports to support this?


Have the protection from falling and security strategies been incorporated in the design?

 


6. Additional information required for Thermal Modelling

 

To complete TM59 Thermal Model we will also need:

  • Construction,
  • ventilation systems specification,
  • proposed windows U and G values,
  • summer overheating strategies.



Get a Quote

insured-licendArtboard 1

Simple Process

We aim to keep the process as simple and un-intrusive as possible with clear up-front quotations for all work.

Certified

All our team of assessors are highly experienced, fully qualified and accredited by approved bodies.

Consultancy

We have an energy assessment consultancy service that includes free Continuing Professional Development (CPD) seminars.

By James Rivers November 20, 2024
Biodiversity Net Gain (BNG) is an approach designed to leave the natural environment in a better state than before. It requires developers to assess the impact of their projects on local ecosystems and take active steps to ensure that the biodiversity is not only preserved but enhanced. As environmental concerns have gained more attention, BNG has emerged as a vital framework for mitigating the negative effects of development on nature, offering a systematic way to restore and improve ecosystems. This is particularly important in the local context, where urbanization and development often place heavy pressure on biodiversity.
By Venkat Puthineedi October 10, 2024
Energy efficiency requirements for new homes and non-domestic buildings are set by Part L (Conservation of Fuel and Power) and Part 6 of the Building Regulations 2010 (“the Building Regulations”). The consultation paves the way for achieving the Future Homes Standard and Future Buildings Standard. It explores technical proposals for changes to the Building Regulations, the associated Approved Document guidance and calculation methods.
By Anthony Howitt September 11, 2024
Our Air Tightness Tester shares his experience at the ATTMA Air Tightness Testing Course.
Show More
Share by: